Water & Sewer Superintendent
Weymouth, Massachusetts, United States
Management, operation, and maintenance of the following public drinking water system supplies, facilities, and infrastructure: • Two surface water supplies• Five groundwater supplies• Five emergency interconnections with the communities of Abington, Braintree, and Hingham. • Two water treatment facilities• One water pressure booster pumping station• One water transfer pumping station• Five water storage tanks (3-active, 2-inactive)• Five pressure reducing valve stations• Two hundred and forty miles of water distribution piping• One thousand five hundred fire hydrants• Three thousand six hundred and forty eight water distribution gate valves• Fifteen thousand five hundred and sixty one customer meters• Three hundred and sixty cross connection/backflow protection devices• Seven remote water system pressure monitoring stations• One garage• Twenty vehicles (automobiles, pickups, utility trucks, dump trucks, backhoes)B. Management, operation, and maintenance of the following sewer collection system, facilities, and infrastructure:• Eleven sewage pumping stations• Nineteen sewage ejector stations• Four thousand five hundred sewer manholes• Two hundred and fifty miles of sewer pipe.• One sewer grit chamber• One septage receiving facility• Fourteen thousand five hundred customer sewer laterals• Fifteen vehicles (pickups, utility trucks, dump trucks, backhoe, television camera truck, high pressure cleaning and vacuum truck)• Thirteen emergency generators• One garage