Subhash Nair
AeroLeads people directory · profile

Subhash Nair Email & Phone Number

Manufacturing Operations Director at Lucy Electric
Location: Leicester, England, United Kingdom 9 work roles 2 schools
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Manufacturing Operations Director
Location
Leicester, England, United Kingdom
Company size

Who is Subhash Nair? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Subhash Nair is listed as Manufacturing Operations Director at Lucy Electric, a with 595 employees, based in Leicester, England, United Kingdom. AeroLeads shows a matched LinkedIn profile for Subhash Nair.

Subhash Nair previously worked as Operations Director Transformers at Brush Group and Head of Operations(Transformers) at Brush Group. Subhash Nair holds B.E, Electrical from The Maharaja Sayajirao University Of Baroda.

Company email context

Email format at Lucy Electric

This section adds company-level context without repeating Subhash Nair's masked contact details.

Lucy Electric

Review company-level records connected to Subhash Nair before choosing the right outreach path.

Profile bio

About Subhash Nair

Outstanding Performance Award for the Year 2007 at ABB Ltd. Vadodara for the contribution to the ABB India Power Transformer Business1.Training/Seminar of Test Engineers for Power Transformer at ABB TRANSFORMER CHONGQING, CHINA. 2. Test Plant Training at ABB, Zongshan, China for Partial discharge measurement3. Test Plant Training at ABB, Poland for Sweep frequency analysis and fault analysis on Transformers4. Training at ABB Germany, for good practices used in Testing of Large Transformers5. Training at ABB Sweden, for Shunt Reactors Testing6.Experts training for Electrical Commissioning Engineer.7. Training for ABB Generator & Transformer Protection, LV & MV Switchgear, Generator Circuit Breaker, Static Frequency Converters, Synchronizing systems (Synchrotact), Batteries and UPS Systems.8. Training for Power Plant Engineers at ALSTOM POWER in MALAYSIA. Training done at SIEMENS LTD (INDIA).1. SIEMENS SIMATIC S5 PLC, at Nashik.2. Project Management Guidelines and ProceduresSpecialties: High Voltage testing and diagnostics on Power Transformers

Current workplace

Subhash Nair's current company

Company context helps verify the profile and gives searchers a useful next step.

Lucy Electric
Lucy Electric
Manufacturing Operations Director
thame, oxfordshire, united kingdom
Employees
595
AeroLeads page
9 roles

Subhash Nair work experience

A career timeline built from the work history available for this profile.

Manufacturing Operations Director

Current

Oxford, United Kingdom

May 2019 - Present

Operations Director Transformers

United Kingdom

Jan 2017 - May 2019

Head Of Operations(Transformers)

Jun 2015 - Jan 2017

Operations Manager (Transformers)

United Kingdom

Work as part of the Operations Management team to achieve flexible, efficient use of resources – people, equipment and buildings across operations.Define and deliver measures of performance and efficiency and assure delivery from the team. Assure visibility and escalation of issues at the earliest opportunity in order to achieve delivery.Ensure the team members adhere to the Quality management system, procedures, policies and instructions.Initiate, investigate and support any cost saving opportunitiesEnsure that all Health, Safety and environment rules, regulations, procedures, policies are fully complied withDevelop positive and productive relationships across the business including, human resources, unions, finance, aftermarket, etcEnsure housekeeping standards meet or exceed company expectations and the prescribed levels.Initiate, promote and implement continuous improvement of process.Minimize waste and maximize efficiency through the organizationAdhere to and apply company policy in all aspectsDeputies for the operations director in their absenceContribute proactively to the development and execution of the production plan. Create the vision across the operations ensuring that all staff has clarity of deliverables and standards required. Assure delivery of the production plan through identification and development of capability of staff throughout the operations,Coach and mentor direct reports, peers and colleagues to deliver to their potential.Plan, direct, monitor, measure and coach team members ensuring that they are capable of and motivated to achieving expected standards for individual and team performance.Monitor team performance, identify any skill or performance gap and reduce and eliminate these through team or individual training, development and coaching.Measure the efficiencies, KPI’s and improve the efficiencies.Upgradation of the existing transformer manufacturing facility and the transformer test laboratory.

Mar 2012 - Jun 2015

Testing Manager -Transformers

Profile:Responsible for testing of Power TransformersThe work involves in setting up a new test laboratory for testing of 150MVA, 230kV class Power Transformers.Fault analysis on transformers.Life assessment studies and diagnostic tests on transformers.

Aug 2008 - Mar 2012

Testing Manager

Abb

Heading a Team of Engineers and Technicians, Testing of Three Phase Power Transformers, Traction Transformer (Locomotive Transformers), AutotransformersI was Involved in the initial design of 765kV Test Lab for ABB Power Transformer, Vadodara.Carried out testing of Power Transformers of Rating of 315 MVA, 200MVA , 260 MVA 1- phase and 3 phase, 154MVA, 100MVA etc. with voltage rating of 400kV , 220kV, 66kV,132kV, etc. Testing of HVDC Transformers, Loco TransformersTrained for Shunt Reactor Testing at ABB, SwedenTrained on Partial discharge measurement and Advanced Partial discharge localization techniques by ABB experts at ChinaExperience in doing the following tests on transformers,Routine Tests as below:Voltage Ratio Measurement, Winding Resistance Measurement of High voltage & low voltage winding, Capacitance & Tan delta Measurements, Insulation Resistance measurement, Magnetic Balance test,No load & Load Loss measurements,Dielectric tests as below:Separate Source, Induced Over Voltage testType Tests as below:Impulse Voltage withstand test, Temperature Rise Test, Zero Sequence Impedance measurement, Sound Level measurementPartial Discharge measurements on 400 kV, 220 kV transformersResponsible for calibration of various testing instruments, test records preparation.Fault analysis on transformers. Planning of Testing and Customer co-ordinationSpecial tests:Sweep frequency response analysis4. Training/Seminar of Test Engineers for Power Transformer at ABB TRANSFORMER CHONGQING, CHINA. 5. Test Plant Training at ABB, Zongshan, China for Partial discharge measurement6. Test Plant Training at ABB, Poland for Sweep frequency analysis and fault analysis on Transformers7. Training at ABB Germany, for good practices used in Testing of Large Transformers8. Training at ABB Sweden, for Shunt Reactors Testing

Mar 2003 - Aug 2008

Commissioning Engineer

Alstom Power (India) Ltd

for GLOBAL PROJECTS.Profile: Commissioning of Electrical Systems for Gas and Steam Based Power Plants.Commissioning of the following Electrical Equipments: Current Transformers, Voltage TransformersPower Transformers of 210 MVA and below.Generator of Capacity of 150 MWGenerator Circuit BreakersABB Make Static Frequency Converter For Gas Turbines.LV Switchgears, Batteries and UPSABB Make REG216 Generator Protection Systems.ABB Synchronizing systemFirst Project: 156.1MW Combined Cycle Power Plant for GSEG at Hazira, India.Second Project: Combined Cycle Power Plant for Ministry of Electricity and Water

Sep 2001 - Mar 2003

Executive Marketing

Siemens Ltd

I&S (Projects) Dept (Project Engineer). Profile: Acquisition and Execution of Turnkey (Electrical) Industrial Projects. and Negotiations of various Industrial Projects.Vendor Development, Material procurement and also handled the commercial part of the projects to a certain extend, Inspection of various equipments at Vendors location.Payment collection from Customers, etc.

Feb 2001 - Aug 2001

A Trainee Engineer (Electrical)

Apollo Tyres Ltd

Preventive Maintenance of AC & DC Motors. Programming and Trouble Shooting of Siemens SIMATIC S5 and S7 PLC. Exposure to Control Systems and Temperature Controllers and Control Valve.PROFESSIONAL TRAININGS UNDER GONETraining done at ABB and ALSTOM POWER in SWITZERLAND for following1.Experts training for Electrical Commissioning Engineer.2. Training for ABB Generator & Transformer Protection, LV & MV Switchgear, Generator Circuit Breaker, Static Frequency Converters, Synchronizing systems (Synchrotact), Batteries and UPS Systems.3. Training for Power Plant Engineers at ALSTOM POWER in MALAYSIA.4. Training/Seminar of Test Engineers for Power Transformer at ABB TRANSFORMER CHONGQING, CHINA. 5. Test Plant Training at ABB, Zongshan, China for Partial discharge measurement6. Test Plant Training at ABB, Poland for Sweep frequency analysis and fault analysis on Transformers7. Training at ABB Germany, for good practices used in Testing of Large Transformers8. Training at ABB Sweden, for Shunt Reactors Testing

Jan 1999 - Jan 2001
Team & coworkers

Colleagues at Lucy Electric

Other employees you can reach at lucyelectric.com. View company contacts for 595 employees →

2 education records

Subhash Nair education

FAQ

Frequently asked questions about Subhash Nair

Quick answers generated from the profile data available on this page.

What company does Subhash Nair work for?

Subhash Nair works for Lucy Electric.

What is Subhash Nair's role at Lucy Electric?

Subhash Nair is listed as Manufacturing Operations Director at Lucy Electric.

Where is Subhash Nair based?

Subhash Nair is based in Leicester, England, United Kingdom while working with Lucy Electric.

What companies has Subhash Nair worked for?

Subhash Nair has worked for Lucy Electric, Brush Group, Brush Turbogenerators, Alfanar Co., and Abb.

Who are Subhash Nair's colleagues at Lucy Electric?

Subhash Nair's colleagues at Lucy Electric include Itti Mangkornthong, Ali Albarrak, Tayla Gittins, Josy George, and Kandavelu Ranganathan.

How can I contact Subhash Nair?

You can use AeroLeads to view verified contact signals for Subhash Nair at Lucy Electric, including work email, phone, and LinkedIn data when available.

What schools did Subhash Nair attend?

Subhash Nair holds B.E, Electrical from The Maharaja Sayajirao University Of Baroda.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Subhash Nair you were looking for.

View similar profiles