Assistant Maintenance Manager
CurrentDesign of mechanical parts and application for availability improvement of the equipment.Critical functions are designed and implemented for the availability improvement and fatigue reduction.Planned and maintained the presses used for heavy forgings like Knuckle and Front axle beam forgings ( 8000T capacity Max.). New Fanuc Robot commission and installation for the required layout.Robot handling equipment to be designed and implemented for ease of access and workingThe Fanuc Robot has been introduced for the critical process handling system. All relevant documents are maintained for the equipment’s and responsible for the work allocation and completions. PM plan will be maintained and take action for the scheduled time and respective will be completed for the planned time. Hydraulic and pneumatic applications were proved for the kind of process application and maintain the above itself Conventional handling equipment has been introduced for the cycle time reduction function as well as produce the low cost automation.