Tom Kipkorir Email and Phone Number
I am a highly committed and results-oriented Civil and Structural Engineer with a graduate degree in Civil Engineering, specializing in Bridge and Structural Engineering. My extensive experience spans the supervision and management of diverse bridge construction projects, including span-by-span prestressed precast box girder bridges, highway interchanges, steel girder bridges, and prestressed concrete (PSC) I-girders. With a strong foundation in contract and construction management, I ensure every project is delivered on time, within budget, and to the highest quality standards.I bring deep expertise in road and highway structure supervision, overseeing projects from inception to completion with attention to detail. My technical proficiency includes Bridge Information Modeling (BrIM), Prestressed Concrete, and advanced structural analysis using Midas Civil, Revit, AutoCAD, and Civil 3D. Skilled in both post-tensioning and pre-tensioning techniques, I am adept at working with PSC I and box girders, composite and steel bridges, and pile foundation systems.My enthusiasm for learning and experiencing new challenges drives me to continuously expand my knowledge and skills in the field of civil engineering. I am eager to leverage my passion and expertise to contribute to innovative projects and make a meaningful impact in the industry.
Civistruct Integrated Systems Ltd
View- Employees:
- 3
-
Bim EngineerCivistruct Integrated Systems Ltd Nov 2024 - PresentNairobi County, Kenya -
Site AgentVictoria Engineering Company Limited Apr 2024 - PresentKilifi County, KenyaConstruction of Masheta Bridge – Chasimba Ward (Kilifi South)Masheta Bridge - 25m span bridge comprising of pad foundation at both Abutments. The Bridge Superstructure comprises of AASHTO type IV PSC I Girders of 25m Nominal span. The bridge has a total of 3No. girders. All the Girders are precast, post tensioned and then hoisted into position.• Managed and led site personnel, including engineers, supervisors, and laborers.• Drafted construction methodologies and schedules for bridge projects.• Supervised site operations, ensuring adherence to design specifications and quality standards.• Planned and coordinated all construction activities to ensure timely project completion.• Ensured compliance with project specifications and standards.• Enforced safety protocols throughout construction.• Monitored project progress and resolved construction challenges.• Performed concrete quality control tests, including compressive strength and slump tests.• Ensured contract compliance and managed claims and variations effectively.• Preparation of the bar bending schedule from the drawings provided for approval.• Liaising with the RE’S team on issues and matters concerning the
-
Assistant Structural/Bridge EngineerVictoria Engineering Company Limited Oct 2023 - PresentKilifi County, KenyaCONSTRUCTION OF MOMBASA - MTWAPA -KILIFI (A7) ROAD PROJECT.- New Mtwapa Market Bridge – 345m span Cantilever Bridge comprising of pile foundations at the Abutments and Piers. The bridge consists of 3 No. spans (100+145+100) comprising of Single Box Double cell Cast In Place Box girder Segments of varying heights, widths and length. - Mtwapa Market Roundabout Bridge – 81m span bridge comprising of pile foundations at the Abutments and Pier. The bridge consists of 2No. spans and the Superstructure comprises of AASHTO type VI PSC I Girders of 40m Nominal span. The bridge has a total of 20No. girders. All the Girders are precast, post tensioned and then hoisted into position.- Mbogolo bridge – 100m span skewed bridge comprising of pile foundations at the Abutments and Piers and Prestressed Concrete I Girders. The bridge has 4No. spans each span having 5No. AASHTO type IV PSC I Girder beams. All the Girders are precast, post tensioned and then hoisted into position.My roles and responsibilities;• Drafting the methodology and construction schedules for construction of the bridges.• Reviewing, checking and proposing changes of the bar bending schedule for the bridges.• Supervision of Installation of water proofing membrane on the bridge deck.• Drafting of methodology for installation of elastomeric expansion joints, elastomeric bearings and PTFE Pot bearings.• Overseeing the construction pile foundations, abutments and piers.• Coordination with subcontractors for specialized tasks e.g Pile testing (HSDL & CSL), footpath waterproofing• Ensuring compliance with the projects specifications and standards.• Monitoring progress and resolving construction issues.• Conducting quality inspections at critical construction stages.• Collaborating with engineering teams on design modifications if needed.• Adhering to safety protocols during all construction activities.• Concrete Quality Control through conducting Compressive strength tests, slump tests .etc.
-
Deputy Site Agent.Swammy Investments Ltd. Feb 2022 - Jun 2023KenyaUPGRADING TO BITUMEN STANDARD OF AKOBWAIT - BENGA - PAPA PRIMARY SCHOOL ROAD10m Concrete Bridge Single span Reinforced Concrete Bridge of 10m in length and 10.6m width. The bridge had 4No. main beams and 3No. cross beams at the abutments and at mid- span. The foundations for the bridge was pad footings embedded on rock. Upgrading 3km road to Bitumen Standards.The main scope was upgrading the gravel road to bitumen standards. The road composed of subgrade material fill layers, cement improved gravel base and 2 layers of surface dressing with 14/20 and 10/14 pre coated chippings as 1st and 2nd seal respectively.My roles and responsibilities included.• Assist in detail setting out of the entire road section (3KM) and marking of the centerline and right of way. • Preparation of the Programme of Works for the entire road and bridge.• Drafting of the work methodology for the construction of the road and bridge.• Preparation of the bar bending schedule from the drawings provided for approval.• Liaising with the RE’S team on issues and matters concerning the project• Supervision of construction of the entire bridge and ensuring all the required standards and specifications are adhered to.• Ensuring that all Rebars were tied and at their correct position• Monitored and enforced safety protocols on-site.• Managed subcontractors involved in construction activities.• Provided regular updates on project milestones and challenges.• Assisted in monitoring project costs and expenses.• Overall management of the site.
-
Assistant Structural/Bridge EngineerDar May 2021 - Oct 2021Nairobi County, KenyaTHE NAIROBI EXPRESSWAY PROJECT.- Construction of Interchanges at Capital Center, Haile Selassie, Museum Hill, Westlands, James Gichuru Mlolongo, SGR, JKIA, Eastern Bypass and Southern Bypass.- Construction of various Toll Stations along the entire road section. Precast of Box girders, Pier shafts, Peir Caps, Retaining wall Blocks, Road Kerbs, Crash Barriers among others.- The precast box girders were of four types with different lengths between 27m to 33m depending on the skew angle of the box girder (< 15°, =15°, >15° - <30°, =30°). Selected bridges had pile foundations while others had pad footing foundations embedded on rock. The box girders were placed into position span by span using crawler cranes and gantry cranes.My roles and Responsibilities included;• Supervision of construction of all interchanges, bridges and retaining walls along the Right of Way.• Ensuring that the Precast girders and concreted properly according to the specifications.• Ensuring that post tensioning is done after the precast box girders attain their required strength.• Close monitoring of the progress of works by the contractor and his adherence to the PoW provided.• Supervision of bridge deck rebar installations, concrete casting, water proofing and laying of Asphalt Concrete (AC) • Writing daily reports which included the extent of work as per that day• Concrete quality control – though conducting compressive strength of concrete cubes, slump tests and giving recommendations. -
Assistant Project Engineer - Kenha Structures DepartmentKenya National Highways Authority Sep 2018 - Oct 2021KenyaCONSTRUCTION OF WEI WEI & LOMUT BRIDGES ALONG THE MARIGAT - MARICH PASS (B4) ROAD- WEI WEI Bridge is a 58m clear span Composite bridge. It consists of bored cast in place pile foundations, concrete sub structures i.e. abutments, modular steel girder superstructure with a reinforced concrete deck. - LOMUT Bridge is a 70m clear span Composite bridge. It consists of bored cast in place pile foundations, concrete sub structures i.e. abutments, modular steel girder superstructure with a reinforced concrete deck. - Both bridges had approach roads totaling to 500m and 800m in length for Wei Wei & Lomut bridges respectively. The general cross section includes; subgrade material fill, sub base consisting of cement improved gravel & Graded Crushed Stone (GCS) and 50mm thick Asphalt Concrete base. Surface dressing using 10/14 pre coated chippings was done later. My roles and responsibilities included;• Design of 2No. concrete crossing drifts at Marich Pass River and Wei Wei river to facilitate the crossings of heavy machines, since the existing bailey bridges could sustain a maximum weight of 10T• Checking and ensuring that all the shop drawings are in order.• Assist the Engineer in carrying out design reviews.• Preparation of project briefs for both bridges to be used in Technical Meetings.• Checking and confirming Interim Payment Certificates (IPC) and Fee Notes. • Writing minutes during site meetings.• Inspecting and ensuring all the Rebars are in place according to the drawing specifications before concreting.• Concrete quality control – though conducting compressive strength of concrete cubes, slump tests and giving recommendations.• Inspection of the steel modular parts and ensuring that all steel components are available.• Ensuring that all safety protocols & measures put in place are adhered to during all construction activities -
Intern - Structures Department, Kenya National Highways Authority (Kenha)Kenya National Highways Authority Jul 2018 - May 2019Nairobi County, KenyaInvolved in design and supervision of several projects in the structures department. Some of the projects included; o Design and Construction of Pedestrian Crossing Facilities across the Thika Superhighway (A2S).o Supply of Steel Modular Bridges Under Austrian Financingo Construction of Marigat & Endau Bridges and approach roads along Marigat- Marich Pass Road (B17)o Consultancy services for the design of a footbridge across Kisumu- Usenge Road in Bondo, for Jaramogi Oginga Odinga University of Science and Technology (JOOUST)o In-House Engineering Design for Magongo - SGR Access Road (Approximately 6km)o Bridges Inspection & Safety Assessment; Maili Tisa- Webuye (A8) Highwayo In – House design of 10 km Lamu port Access Road.My Roles and responsibilities included but not limited to;• Taking part in site visits to observe construction progress and assess structural integrity of bridge and road structures.• Attending trainings such as Understanding of Eurocodes, corrosion Control, FIDIC, Midas software Training among others.• Drafting correspondences on behalf of the client to consultants and contractors.• Drafting technical drawings and documentation for bridge projects.• Assisting in the preparation of project proposals and reports.• Conducting research on new materials and construction techniques for bridges.• Participating in meetings with consultants and stakeholders to discuss project requirements and specifications in regard to design and construction of highway structures.• Assisting in the inspection and evaluation of existing bridge structures for maintenance or rehabilitation purposes.• Contributing to the implementation of quality control measures to ensure compliance with industry standards and specifications.• Undertaking any additional tasks or projects assigned by senior engineers or supervisors to support departmental objectives.• Assisting engineers in structural analysis and design of bridges and approach roads to bridges.
Tom Kipkorir Education Details
-
Second Class Honors
Frequently Asked Questions about Tom Kipkorir
What company does Tom Kipkorir work for?
Tom Kipkorir works for Civistruct Integrated Systems Ltd
What is Tom Kipkorir's role at the current company?
Tom Kipkorir's current role is Civil & Structural Engineer (GE) | Bridge Design, Review & Construction | Bridge Information Modeling (BrIM) | Prestressed Concrete | PSC I & Box Girder Bridges | Piling | AutoCAD | Revit | Civil 3D |Midas Civil |.
What schools did Tom Kipkorir attend?
Tom Kipkorir attended University Of Nairobi.
Not the Tom Kipkorir you were looking for?
-
2yahoo.com, basf.com
2 +197324XXXXX
-
Thomas Kipkorir
Kenya -
1gmail.com
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial