Resident Engineer Etm Iii
responsibilities included,.....quality control and safety. Work involved Runway '4' relocating a localizer antenna outside of the runway safety area( beyond 1000' from the end of the runway) and installing breakaway bolts at 4 stations with multiple lights. Installing a new localizer shelter, and providing power and control cabling to same. and rerouting several hundred feet of new control cable to insure long term operability. Runway 28 relocating a utility box outside the (RSA ) again, and 2 stations with breakaway bolts. Rwy 28 one station with breakaway bolts.