Production Engineer
CurrentCurrently assigned to a project providing production planning to create work plans for the construction activity task on a RAS building facility (approximately 320,000 S/F) consisting of 36 OG prestressed concrete tanks approximately 626,476 gallons each and (6) six biofilter structures. In addition, the project also includes (1) one Equalization Tank with pump station approximately 1.7 million gallons, (2) two 430,000 gallons clarifier prestressed concrete tanks with splitter box, Pretreatment Structure and Chiller Facility Building.